Wednesday, 9 April 2008
The first sets of groundloop panels are installed
A long day resulted in the first set of pipe panels being safely inserted into the trench dug yesterday. Each is now 3 metres down with a bed of sand protecting the pipes from damage. Leaks are not required for at least 25 years. Pressure testing for leaks will begin tomorrow - final backfilling to follow.